The drywall is almost finished. Ceilings in the two main floors are textured and walls are sanded. One or two more days in the basement and we are ready to start painting on the primer this weekend. The hardwood flooring is on site - delivered and unloaded by us... Electric and water lines are buried and connected. Movers are scheduled for September 22. A lot has to happen between now and then, but I'm moving no matter what.
0 Comments
Leave a Reply. |
AuthorMy name is Christy Franklin. Archives
February 2021
Categories |